Shield machine of south line of Yellow River tunnel starts boring in Jinan-Xinhua

亚洲一级美女视频,最新国产一级特黄Av,最新精品国偷自产在线观看,亚洲电影小视频三

    <cite id="xgsqj"><listing id="xgsqj"></listing></cite>
  1. Shield machine of south line of Yellow River tunnel starts boring in Jinan

    新華網(wǎng)

    Editor: huaxia

    2025-05-10 07:35:40

    Staff workers work at the construction site of a Yellow River tunnel in Jinan, east China's Shandong Province, May 9, 2025. A shield machine of the south line of the Yellow River tunnel started boring in Jinan on Friday, with an excavation diameter of 15.06 meters.

    The Yellow River tunnel has a total length of 3,888 meters, with 3,252 meters to be excavated using a shield machine. It is designed as a six-lane, bidirectional highway with a speed limit of 60 km/h. (Xinhua/Xu Suhui)

    This photo shows "Qihang," a tunnel boring machine deployed for the construction of a Yellow River tunnel in Jinan, east China's Shandong Province, May 9, 2025. A shield machine of the south line of the Yellow River tunnel started boring in Jinan on Friday, with an excavation diameter of 15.06 meters.

    The Yellow River tunnel has a total length of 3,888 meters, with 3,252 meters to be excavated using a shield machine. It is designed as a six-lane, bidirectional highway with a speed limit of 60 km/h. (Xinhua/Xu Suhui)

    Staff workers work at the construction site of a Yellow River tunnel in Jinan, east China's Shandong Province, May 9, 2025. A shield machine of the south line of the Yellow River tunnel started boring in Jinan on Friday, with an excavation diameter of 15.06 meters.

    The Yellow River tunnel has a total length of 3,888 meters, with 3,252 meters to be excavated using a shield machine. It is designed as a six-lane, bidirectional highway with a speed limit of 60 km/h. (Xinhua/Xu Suhui)

    Technical staff conduct inspection inside "Qihang," a tunnel boring machine deployed for the construction of a Yellow River tunnel in Jinan, east China's Shandong Province, May 9, 2025. A shield machine of the south line of the Yellow River tunnel started boring in Jinan on Friday, with an excavation diameter of 15.06 meters.

    The Yellow River tunnel has a total length of 3,888 meters, with 3,252 meters to be excavated using a shield machine. It is designed as a six-lane, bidirectional highway with a speed limit of 60 km/h. (Xinhua/Xu Suhui)

    Technical staff conduct inspection inside "Qihang," a tunnel boring machine deployed for the construction of a Yellow River tunnel in Jinan, east China's Shandong Province, May 9, 2025. A shield machine of the south line of the Yellow River tunnel started boring in Jinan on Friday, with an excavation diameter of 15.06 meters.

    The Yellow River tunnel has a total length of 3,888 meters, with 3,252 meters to be excavated using a shield machine. It is designed as a six-lane, bidirectional highway with a speed limit of 60 km/h. (Xinhua/Xu Suhui)

    Technical staff conduct inspection inside "Qihang," a tunnel boring machine deployed for the construction of a Yellow River tunnel in Jinan, east China's Shandong Province, May 9, 2025. A shield machine of the south line of the Yellow River tunnel started boring in Jinan on Friday, with an excavation diameter of 15.06 meters.

    The Yellow River tunnel has a total length of 3,888 meters, with 3,252 meters to be excavated using a shield machine. It is designed as a six-lane, bidirectional highway with a speed limit of 60 km/h. (Xinhua/Xu Suhui)