亚洲一级美女视频,最新国产一级特黄Av,最新精品国偷自产在线观看,亚洲电影小视频三

    <cite id="xgsqj"><listing id="xgsqj"></listing></cite>
  1. Changji-Guquan transmission link to be finished within 2018

    Source: Xinhua| 2018-02-06 21:48:25|Editor: pengying
    Video PlayerClose

    CHINA-CHANGJI-GUQUAN UHVDC TRANSMISSION LINK (CN)

    Aerial photo taken on Feb. 6, 2018 shows the construction at the south bank of the Yangtze River of the Changji-Guquan UHVDC (ultra-high voltage direct current) transmission link in Digang Town under Fanchang County, east China's Anhui Province. The ±1100 kv Changji-Guquan transmission link will set a world record in terms of voltage level, transmission capacity and distance. The link is expected to be finished within 2018 with the installation capacity of 12,000 megawatts. (Xinhua/Guo Chen)

       Prev 1 2 3 4 5 6 Next  

    KEY WORDS: voltage level
    EXPLORE XINHUANET
    010020070750000000000000011100001369538321